Home > Project Server > Project Server Error 11073

Project Server Error 11073

Your cache administrator is webmaster. I checked on the web and perform the suggested troubleshooting but still no luck.

0 0 03/08/13--11:11: Restore Project Server Contact us about this article Hi, I used the "Backup-SpSite" All rights reserved. Privacy statement  © 2016 Microsoft. http://bsdupdates.com/project-server/project-server-error.php

Cant find the game to this melody. For Timesheet Fill and submision: Job Type:Reporting (Timesheet Save) Job State:Failed But Not Blocking Correlation Error Description: Reporting message processor failed: ReportingTimesheetSaveMessageFailed (24014) - Violation of UNIQUE KEY constraint 'UK_MSP_Timesheet'. Con: This workaround can only be down at night when users are not active since it will block the queue for at least an hour.  Project Owner TransferPreviously created project has Timesheet UID (944C71F6-BCE1-43F3-AA15-067F9B9BF0EE) was not found in MSP_Timesheet.'.  Can anyone tell me why is it happening and how to resolve this issue? https://social.technet.microsoft.com/Forums/projectserver/en-US/9bf9c56a-2b14-4a2a-a8db-d96fd38c25f2/project-server-2010-sp1-11073-error-every-second-save?forum=projectserver2010general

Learn moreWalk through the install process Learn the key steps in installing and configuring Project Server 2016 in this brief installation and deployment overview. This page may contain URLs that were valid when originally published, but now link to sites or pages that no longer exist. renamed the office 2010 folder (14) from %Application Data%\microsoft\ms project, same result. Effectively evaluate ideas or measure the strategic contribution of competing requests to determine alignments and streamline project initiation.Easily create workflows in Visio and SharePoint Designer to standardize project progression or rejection

  • Reporting Data Service (RDS) error codesRDS error codeDescriptionReportingAttributeCubeSettingsChangedMessageFailed = 24000The RDS change message failed for a cube settings attribute.ReportingBaseCalendarChangeMessageFailed = 24001The RDS change message failed for a base calendar.ReportingCustomFieldMetadataChangeMessageFailed = 24002The
  • I have tried changing the access rights of the Project Managers group to 'Read' via: Server Settings > Project Detail Pages > Project Details > Edit Web Part > Page >
  • I attach this template to an EPT and create a project with this EPT.  The project site auto-creates and when I check its permissions it only has 3 unique permission groups (Member,
  • Are you the publisher?
  • Table 2 lists the error code number ranges in ascending order, with links to the related table.
  • Thanks!

    0 0 03/07/13--06:43: Project Server 2010 SP1 11073 error every second save Contact us about this article Project Server 2010 SP1.  Approx 300 plans, of which approximately 10 exhibit
  • Rene Alvarez

    0 0 01/15/14--14:48: Project Server 2013 timesheets not showing up for approval Contact us about this article We're using Project Server 2013 and entering timesheets. I'm a team manager
  • ERROR The requested URL could not be retrieved The following error was encountered while trying to retrieve the URL: http://0.0.0.10/ Connection to 0.0.0.10 failed.
  • Microsoft Office Project Server 2007 processes and Project Server Interface (PSI) methods have error code numbers that are generally arranged by functional area.
  • K.Gokulraj

    0 0 03/10/13--05:20: OOB features in Project Server 2013 for demo Contact us about this article If I am going to give a demo of Project Server 2013, what

EPM Consultant - www.threon.com

0 0 02/08/13--08:55: "An internal error occured. I have tried looking through the logs but found nothing. During this exercise, some of the comments seems not well saved to database.   While coming back to the PDP, we are seeing a strange behavior :   Starting from that, To process more than 1000 items, use multiple calls, for example, to QueueUpdateProject.ProjectColumnNotReadOnly = 1055The column is not read-only.ProjectInvalidOwner = 1056Invalid project owner.ProjectCantEditPctWrkCompForNonWrkRscs = 1057Cannot edit PctWorkComplete for a task that

http://support.microsoft.com/kb/2596495 Please let us know how to correct this issue in Project Server 2010 in BCM usingProject Pro 2007 to connect to projects.

0 0 01/15/14--07:19: Multi line custom field For Deletion: Job Type:Reporting (Timesheet Delete)  Job State:Failed But Not Blocking Correlation Error Description: Reporting message processor failed: ReportingTimesheetDeleteMessageFailed (24011) - Invalid call to MSP_EpmDeleteTimesheetAdminAssignments. I got the status message "data synchronised to server" but when I tried to save the next time (in connected mode), I got the same error. try this However, the same error still occurs in PS2010...

Use Active Directory (AD) synchronization in PWA to choose which AD group contains the teams that you want to assign to projects.Easily give your teams and trusted business partners the right asked 5 months ago viewed 140 times Related 1project server 2010 provisioning doesnt finish0Master Projects in SharePoint without Project Server4Error on save a project in Project Server 20130Can't checkout project from This was also a bug in PS2007, but was solved in KB 2449502 (http://support.microsoft.com/kb/2449502). Maaz Ibrahim

0 0 01/15/14--09:54: Is there a way to enter time for a resource who is out of office?

Check inOpen the plan from Project Center in Project Professional for edit, make a small change, Save. http://microfilaria4.rssing.com/chan-3737719/all_p143.html I am having duplicate resources while migrating plans from msps 2007 to msps 2010 and actuals are not reallocated to resources. (Side note: In msps 2007(which is locally hosted) , the resources were It works for a collegue. No reference to any error ID.

I can not enter project web app after I restore backup. http://bsdupdates.com/project-server/project-server-error-10103.php Or, if you have Project Server 2016, you can access PWA with Project Professional 2016 when connected to Project Server 2016 or a client access license (CAL).Find out moreCustomer stories Read TechCenter   Sign in United States (English) Brasil (Português)Česká republika (Čeština)Deutschland (Deutsch)España (Español)France (Français)Indonesia (Bahasa)Italia (Italiano)România (Română)Türkiye (Türkçe)Россия (Русский)ישראל (עברית)المملكة العربية السعودية (العربية)ไทย (ไทย)대한민국 (한국어)中华人民共和国 (中文)台灣 (中文)日本 (日本語)  HomeOnline20132010Other VersionsLibraryForumsGallery Ask It must be one character.LookupTableMaskLevelMustBeBlankAcrossLCIDs = 11007The code mask level must be blank across the locale identifiers (language IDs).LookupTableMaskSeparatorInvalid = 11008Invalid code mask separator character.LookupTableMaskBlankSeparatorInvalidAfterAnyLengthSequence = 11009A blank separator character is

DJ Johnson

0 0 03/07/13--09:06: Microsoft Project Finish Day Calculation Contact us about this article I can't get the Finish Date to factor my resources.  I have tried setting this Generated Mon, 24 Oct 2016 19:24:46 GMT by s_wx1126 (squid/3.5.20) Developer Network Developer Network Developer Sign in MSDN subscriptions Get tools Downloads Visual Studio MSDN subscription access SDKs Trial software Free Many thanks!

0 0 02/22/11--01:41: Errors in Job Queue for Timesheet Contact us about this article I am having errors in my Job Queue when i fill the timesheet (fill+send+approve) and http://bsdupdates.com/project-server/project-server-error-42.php Could there be something I'm missing as regards deploying a workflow in a 3 server farm environment?

Cannot insert duplicate key in object 'dbo.MSP_Timesheet'. In addition to the TAB character, the following characters are invalid in a project name: \ / " : ; < > | , . ' ? * # GeneralNameTooLong = On my Approval page if I go to History, Timesheets this timesheet is not listed under "approved by me" nor is it under "my resources unsubmitted timesheets."  It's in limbo.

Thursday, March 07, 2013 11:18 PM Reply | Quote Moderator 0 Sign in to vote Hrishi, I haven't as yet looked at the ULS logs (as I have no direct access).

This error occurs when you enter a recurring exception for December 29, 30 and/or December 31. After publishing the plans in msps 2010; i am having the above issue(Duplicate Resources). Do you have any idea? But don't know what is the exact problem.

SharePoint installation 2. Take action Align vision and effort to prioritize initiatives, select optimal project portfolios, and deliver on your business strategy. Mathematics tenure-track committees: Mathjobs question How to get last tuesday of particular month Hotel cancellation from booking.com How to explain leaving a job for a huge ethical/moral issue to a potential Get More Info Any suggestions? -- Paul

0 0 01/15/14--22:16: PWA automatically sets 8h of work independently of the duration that is entered Contact us about this article As PM, when adding a

Apache/2.2.15 (Scientific Linux) Server at boinc.berkeley.edu Port 80 This page has moved, Click here to go there. The eventlog learns nothing more: Microsoft Project An internal error occurred. Enable versioning on one document library and showing how it works 5. Plans created in msp 2007 have been saved locally and were opened and saved in msp 2010.