For that, each project was open with Project Pro, the tasks have been unactivated which generate some schedule changes (what was expected). Why? Anyway, option 1 did resolve the problem and I believe option 2 would also. Many thanks in advance for your advice and help. http://bsdupdates.com/project-server/project-server-error-16400.php

I have a custom field (plain text) that is also assigned to Department X. Cause: The project WBS/Schedule template uses Enterprise Resources that have been deleted or converted to Users. What it is possible to make, that it appeared in the period (03.01.2013 - 09.01.2013) and earlier?

0 0 01/27/13--00:55: actuals, not approved yet, not in cube Contact us about The errors returned from the queue are as follows:  Error ID: 16400 Error ID: 26000 Detailed error below - send it to the administrator for more detailed troubleshooting.    https://social.technet.microsoft.com/Forums/projectserver/en-US/cf074a6a-acef-4dec-91aa-4bd078f8f5aa/error-16400-createwsssitecontent-creating-project-site-failed-project-server-2010?forum=projectserver2010general

personal protection virus microsoft sync center Where do I ask about general Visual Studio issues: Visual Studio 2008 long shutdown time Where to ask for info on Dr. Please note in above script the identity will be the GUID from the first error message and URL will be the PWA instance where you want this template to work. Project Server 2010 Queue Error: WSSCreateSiteFailure (16400) -26000 Issues March 10, 2013 Leave a comment Error Description:  Your CreateWssSite job failed.  Its current state is FailedNotBlocking.  It was 0% complete.  It However when viewing the Project Sites from the Project Sites admin (/pwa/_layouts/pwa/Admin/ManageWSS.aspx) it showed there wasn't a Project Site.

Status Manager opens the Project Schedule and adds planned work starting 12/31 - saves the plan Status Manager previews the task updates and the start date is 12/31 / status manager Project Uid=8954d23b-ed59-4c18-9ec4-6c6f1970807e, site URL=http://tspm01/PWA/testss2, site name=testss2. Then the project was saved and published (all tasks have a 'published' status to YES). Worked for me without any issue, not playing with solution starter on this system ;-).

Posted by Nick Kellett at 11:09 PM Labels: 2010, bugs, project server, templates Actions: No comments: Post a Comment Newer Post Older Post Home Subscribe to: Post Comments (Atom) Onwards and I have a resource (say John Smith) that is assigned to Department X. Search Recent Posts How to Change Working or Non-Working time for an EnterpriseResource How to perform a bulk publish viaPowerShell An error has occurred during reportprocessing Active Users report LastAccessed Archive https://badalratra.wordpress.com/2013/03/10/project-server-2010-queue-error-wsscreatesitefailure-16400-26000/ Why does MSP display the Actual Work as a different decimal fraction instead of the original 3.5h captured on the timesheet?

Details: id='16400′ name='WSSCreateSiteFailure' uid='bb9a4b90-5c77-4dc4-9bc9-2854554f6288′ projectUID='5fd8daf5-619f-46c5-b884-8efe39b5935a' workspaceUrl='http://myserver.f.q.d.n/PWA/Test1/Test1′ projectWorkspaceName='Test1′. Microsoft.SharePoint.SPException: The site template requires that the Feature {0575f1d6-6c61-4be7-9d01-77aaa8b392a4} be installed in the farm or site collection.

  1. Privacy statement  © 2016 Microsoft.
  2. The timesheet line is approved by the schedule owner and line manager using the PWA Approval Center.
  3. To compound the problem, sometimes the task start and end dates on the users' timesheets move and so no longer correspond to the task start and end dates in the Project
  4. Make sure you start the below service, this will fix the issue.
  5. MSP displays3.48h instead of the 3.5h that was captured on the timesheet.
  6. Team Planner view is good tool , but with similar activities in the project , sometime it is confusing which task is it , so I want to add Task ID
  7. Switch([% Complete]=100,"Complete",(([% Complete]<100) And ([Finish](ProjDateDiff([Project Start],[Project Finish])*0.1),"There are task(s) that are overdue") 2) It is
  8. From the message it appeared a feature hadn’t been activated and peeking into the content database this appeared to be something to do with AssociationForm.xsn.

Is there any workaround to this because publishing the projects could lead to re-sending the notification emails to everyone... https://badalratra.wordpress.com/2013/08/18/error-id-9133-or-26000-project-server-2010/ Reply Albert Owonubi says: April 6, 2016 at 2:56 pm This works also in Project Server 2013 thanks for the Instructions Reply Follow UsPopular TagsProject Server 2007 Project Server 2010 Project We did not control every projects and assignments as it seemed to be ok. We have to make some corrections on projects (unactivate tasks).

Microsoft.SharePoint.SPException: The site template requires that the Feature {b90f23c9-68d5-4570-a3ef-4e491ee6d35a} be activated in the site collection WSSCreateSiteFailure (16400). see here To get more information about the job failure, please go to Project Web App.  Select Personal Settings from the left menu.  Then select My Queued Jobs. Also, see if you can go back to a previous version of the file before you experienced circular relationship issues. Hope this helps you.  [DS1]How Share this:TwitterFacebookLike this:Like Loading...

March is the right term. Reply [email protected] says: March 13, 2013 at 3:03 am Hi There I have been following the above steps as per usual but now i am getting this issue as well. It entered the queue at 03/07/2013 09:35:57. this page Thank you!

Project Uid=448aa1e5-5e07-e411-9430-005056010737, site URL=http://siteaddress - activated feature at PWA level, site name=site address activated feature at PWA level. Attached Pictures in Outlook Express Won't Open Anymore (Like They Always Have) With Windows Picture and Fax Viewer Help with IE8 - keeps minimizing when mouse is being used to direct Strangely enough if i create a site with the site template from the EPT then the project site gets created.

I find that only task name is visible in the Bar in the team planner view ?

Please note, in this case, we are assuming one Project template configured in MS EPM Project Management System. To get more information about the job failure, please go to Project Web App. I would first turn off automatic calculation and then apply the Summary Tasks filter. Contact us about this article Hi, i want to ask how to Move task table to right hand side of gantt chart?

Wednesday, January 30, 2013 4:35 PM Reply | Quote 0 Sign in to vote Hi Can you provide some more details around what were the customizations done on the site template, I tried to insert a table manually from excel but the rows never align correctly with my tasks. Search Recent Posts How to Change Working or Non-Working time for an EnterpriseResource How to perform a bulk publish viaPowerShell An error has occurred during reportprocessing Active Users report LastAccessed Archive Get More Info Then select My Queued Jobs.

and how to avoid it ?